AHM 800-R
on sections
with grade 2 mixture
The AHM 800-R is used on sections in which grade 2 mixture is installed. It is able to remove the ballast with the ballast excavating chain, crush it on the machine, mix it with new material and re-install it as a formation layer/frost layer. Installation of the new ballast is carried out in a separate operation.
| Performance ø in 12 hours | 300 m |
| Max. performance per hour | 60 m |
| Ballast Excavation Chain - Capacity | 300 cbm/h |
| Excavation width | 4.000 - 4.600 mm |
| Subgrade Excavation Chain - Capacity | 500 cbm/h |
| Excavation width | 4.030 - 6.000 mm |
| Excavation depth max. | 1.390 mm |
| Installation height up to | 500 mm (PSS/FSS) |
| Installation height, track formation layer | 300 mm |
| Material supply (backwards) | Container carriage 12 or 24 cbm |
| Evacuation (to the front) | MFS 100 |